Pharma freight is valuable and sensitive, and much of it needs temperature control.
An estimated $35 billion in pharma products is lost every year to temperature excursions, when a product leaves its approved temperature range. Most of these losses come from process gaps and poor visibility, not broken equipment.
Yet many teams still manage transport with old tools. In Xeneta's The 2026 Freight Report, about 4 in 10 of the 450 supply chain leaders surveyed say old systems that don't connect to new tools are one of their top three problems. And when plans break, costs rise fast: a manager at a US chemicals and pharma company describes a sudden customs change that forced them to "airfreight emergency batches at triple the cost."
So where do pharma transport teams struggle most, and what can they change? This post covers the main pain points, why cold chain capacity is getting tight, where the losses come from, how to pick the right transport mode, what GDP rules expect from shippers, and five practical moves for logistics and procurement teams.
Pharma logistics and procurement teams describe the same handful of problems, whatever their size.
The sections below look at each of these, and at what shipper teams can change.
Pharma logistics used to be mostly tablets in ambient trucks. That picture is changing fast.
The money follows. Grand View Research values the healthcare cold chain third-party logistics market at $45.76 billion in 2025, rising to $83.40 billion by 2033, a 7.74% annual growth rate. Market estimates vary a lot depending on scope, but they all point the same way: up.
For freight teams, this changes the shape of the work. Shipments are getting smaller, more frequent and more urgent. One product family can need several temperature bands, each with its own packaging, equipment and qualified carriers.
A procurement model built for a few large ambient lanes struggles with that mix. It was designed for volume and price, not for qualification and speed.
The $35 billion figure comes from the IQVIA Institute and has been quoted for years. What matters is what it includes.
According to IQVIA's Biopharma Cold Chain Logistics Survey, it covers lost product, clinical trial loss and replacement costs, wasted logistics spend and the cost of root-cause analysis.
In other words, the bill is not only spoiled product. It is the rework, the replacement batch, the investigation and the delayed patient.
Estimates vary. DSV puts the cost of cold chain breaks and in-transit temperature deviations at $20 billion to $35 billion a year. Either end of that range is a serious number.
The frequency is just as striking. Air Cargo Week reports that 12% of pharmaceutical shipments still experience temperature excursions. And the trend is not improving: in a 2026 WBR survey of 120 senior pharma and logistics leaders, 92% reported an increase in loss, theft and temperature excursions.
The cause is just as telling. The International Society for Pharmaceutical Engineering reports that most of these losses come from process gaps and poor visibility, not equipment failure. A better box does not fix a bad handover. As one cold chain packaging executive put it to FreightWaves, the conversation needs to move "beyond container specs."
That shifts the problem from engineering to process: who was booked, how they were chosen, what information they received and how fast a deviation was spotted.
Excursions rarely happen while a product sits in a validated warehouse or a monitored reefer at cruising speed. They happen at the seams, where custody changes hands and nobody owns the clock.
The pattern is clear. Every seam is a decision point: who takes the shipment next, what they were told, and whether they were qualified for that temperature band.
Demand is only half the story. Qualified capacity is the other half, and it is tight in every mode.
Certification narrows the pool further. In air, IATA's CEIV Pharma standard is the reference, and even large networks are selective. Lufthansa Cargo runs more than 350 stations worldwide, of which around 120 offer Active Temp Control. FedEx reached its 30th CEIV Pharma certification in August 2026. The qualified capacity exists, but it is concentrated.
The practical result: when an unplanned need appears (a delayed batch, a closed lane, a clinical shipment), the pool of carriers you can legally and safely use is small. Urgency plus a short list is exactly the situation where premiums climb and shortcuts happen. Aviation faces the same squeeze, as we saw in our guide to AOG logistics for urgent aircraft parts.
Mode choice is now a cold chain decision, not only a cost decision.
Many shippers are moving stable volumes to sea. AstraZeneca, for example, has reported moving 55% of its global freight by ocean, compared with 90% by air five years earlier. But not every product can wait.
| Mode | Best fit | Main cold chain risk | What procurement should do |
|---|---|---|---|
| Air | Clinical trial material, cell and gene therapies, short shelf life, urgent replenishment | Airport dwell, handovers, limited payload for active containers | Qualify CEIV Pharma partners per lane and pre-agree backup routings |
| Ocean reefer | Generics and stable commercial volumes with long shelf life | Long transit and port congestion turning delays into excursions | Set clear rules for when a delayed shipment switches to air |
| Road (GDP reefer) | European distribution, plant to DC, DC to wholesaler, and the first and last leg of every other mode | Load rejections, trailer shortages, dwell at loading docks | Keep a qualified pool per temperature band and compare urgent offers in minutes |
DHL's guidance is practical. Ocean works best for generics and non-urgent shipments with longer shelf life, and companies should establish clear escalation criteria from ocean to air or charter before a disruption forces the call.
Whatever the main mode, road carries the first and last leg of most multimodal transport chains. That is where most procurement teams have the most control and the most carriers to choose from.
In Europe, the EU Good Distribution Practice guidelines (2013/C 343/01) set the bar.
Chapter 9 requires that temperature conditions stay within acceptable limits during transport. Chapter 7 requires that responsibilities between all parties in the chain are clearly defined. Since 2013, companies have also been expected to validate the distribution routes they use.
The key point for freight teams: the shipper keeps responsibility for the product, even when the carrier owns the truck. That makes carrier choice a quality decision with an audit trail, not only a price decision. An urgent booking made by phone, without the qualification file in hand, is not a logistics shortcut. It is a compliance gap.
In practice, a qualification file for a temperature-controlled carrier usually covers:
Where temperature is not continuously monitored, German guidance notes that a risk assessment of the transport routes must be made. Either way, the paper trail has to exist before the truck arrives.
Picture a Thursday afternoon. A batch of refrigerated product (2 to 8°C) is released a day late, and it has to reach a distributor in another country by Monday.
Here is the same booking done two ways.
| Step | Ad hoc booking (email and phone) | Pre-qualified, competitive booking |
|---|---|---|
| Finding capacity | Call known carriers one by one until someone says yes | Send one request to every carrier qualified for 2 to 8°C on that lane |
| Checking qualification | Done after the fact, or not at all | Already done: only qualified carriers see the request |
| Price | One quote, accepted under pressure | Several offers side by side, against a market benchmark |
| Instructions | Scattered across emails | Temperature range, handling notes and contacts attached to the booking |
| Audit trail | Rebuilt later for the quality team | Created with the booking |
| Time to confirm | Hours | Minutes |
The product, the lane and the deadline are identical. The risk and the cost are not.
This is the job of a transportation management system (TMS). Easy4Pro, for example, is a TMS: it does not move freight itself. Shippers manage their own contracted, pre-negotiated and spot rates with their own carriers in one platform, and send an urgent request to their pre-approved carrier list in one step instead of ten phone calls. Across its clients, Easy4Pro reports an average 28% freight cost avoidance and shipments booked in under 2 minutes.
You cannot manage carrier performance on a temperature band you do not measure. These indicators turn the cold chain from a black box into something procurement can negotiate on.
| KPI | What it tells you |
|---|---|
| Excursion rate per carrier and lane | Where to focus joint improvement with partners, lane by lane |
| Average excursion duration | How long a problem runs before someone acts |
| Response time to temperature alerts | Whether monitoring actually leads to action |
| On time, in full (OTIF) by temperature band | Reliability where it matters most |
| Share of shipments booked as urgent | How often the plan breaks, and where premiums leak |
| Product loss value from excursions | The number finance and quality both understand |
Most of these come straight from industry practice. Pharma logistics specialists point to excursions per carrier, lane or route, response time to alerts and product loss value, alongside OTIF and temperature compliance scores.
The share of urgent bookings is the one most teams forget. It is often the clearest signal of hidden cost.
Cold chain demand will keep growing faster than qualified capacity. Packaging and sensors matter, but most losses start earlier: in rushed decisions, unclear handovers and bookings made under pressure.
Teams that treat carriers as long-term partners, partner selection as a quality process and urgent buying as a transparent one, protect both the product and the budget. The cold chain is no longer a niche inside pharma logistics. It is becoming the main chain, and it deserves the same discipline as the rest of procurement.
If your team manages temperature-controlled freight and wants to compare notes on how to structure it, talk to the Easy4Pro team.